FORACO Australia

Coal and Energy Drilling Expertise

FORACO commenced drilling in the Bowen Basin in 2010. 

An initial four rig contract expanded quickly to six rigs. The majority of rigs were located 70km north of Moranbah on a project known for its deep “mushy coals”, swelling shales and generally difficult drilling conditions.

This site was also the inaugural project for the Safe T Sloop (STS) which introduced mechanized hands free rod handling for all drilling operations including diamond coring. One of Safe T Sloop’s first wells was complimenting Rig 3 on a 985m rotary mud chip hole where others had previously failed to reach TD. 5 9/16” casing was set at 655m and the hole advanced with a 5” PCD bit to 965m.

In the ensuing ten years, FORACO has completed hundreds of thousands of metres of drilling, including:

  • chip sampling,
  • HQ and PQ wireline coring,
  • 4” and 8” conventional coring,
  • CSG exploration,
  • Water Wells and
  • instrument installations.
  • Location

    Bowen Basin, Queensland

  • Date

    2010 to current

  • Rigs

    Up to 10 rigs in area

  • Methodology

    Diamond Drilling, Air Chipping, Mud Rotary, CSG Exploration, Water Wells, Large Diameter coring (4” and 8”)

  • Hole Specifications

    Various methods up to 1,000m

Integrity, Innovation and Involvement are the core values that define FORACO Australia