FORACO commenced drilling in the Bowen Basin in 2010.
An initial four rig contract expanded quickly to six rigs. The majority of rigs were located 70km north of Moranbah on a project known for its deep “mushy coals”, swelling shales and generally difficult drilling conditions.
This site was also the inaugural project for the Safe T Sloop (STS) which introduced mechanized hands free rod handling for all drilling operations including diamond coring. One of Safe T Sloop’s first wells was complimenting Rig 3 on a 985m rotary mud chip hole where others had previously failed to reach TD. 5 9/16” casing was set at 655m and the hole advanced with a 5” PCD bit to 965m.
In the ensuing ten years, FORACO has completed hundreds of thousands of metres of drilling, including:
- chip sampling,
- HQ and PQ wireline coring,
- 4” and 8” conventional coring,
- CSG exploration,
- Water Wells and
- instrument installations.
-
Location
Bowen Basin, Queensland
-
Date
2010 to current
-
Rigs
Up to 10 rigs in area
-
Methodology
Diamond Drilling, Air Chipping, Mud Rotary, CSG Exploration, Water Wells, Large Diameter coring (4” and 8”)
-
Hole Specifications
Various methods up to 1,000m